Phase 3
Getting it ready for some action









Phase 1 was installing the new engine and transmission, exhaust, and fuel system to be able to run the car. Phase 2 was to get all the little things worked out, and make the car 100% streetable. Now is time for Phase 3, getting it ready for some action.




Click on any of these to get details





From 220 HP to 950 RWHP





Moving the Steering to Fit Headers







Battery Relocation


The battery has been moved to the trunk and a rear cut off installed to meet NHRA Rules. Full details on the battery relocation are here.





Hood Pin Instalation



The car needs Hood Pins, so they were installed. This will prevent the hood from flexing, and coming up at speed.





Getting Coil Overs Made and Installed






Interior for Weekend Only Car






The Ignition to Fire It

MSD Digital 7 replacing the Digital 6

With the Digital 7, I can run the 8261 coil. This provides 2 full amps of spark, compared to 450 Ma, This is a 400% increase over the Digital 6.





Solid Motor Mounts






Making the Cowl Hood funtional






The Lentech Strip Terminator Transmission








The New TCS Torque Converter




Fuel Cell Instalation





Side Exit Ezhaust





Fuel System







The New Detroit Locker,
Billetflow Brace
and HD Half Shafts






Time For Some Serious Rubber






1 3/4 Long Tube Headers






YSi Vortech Install






Roll Bar Install






FAST Wideband O2






Converting to E85 and Carb Tuning






Installing a Manual Rack and Pinion




Front



Rear


Upgrading the Brakes





Cooling the Transmission






Cooling the Engine -
A large Radiator,
and Mark 8 Fan.






DMH - Electric Cutouts.






Tail Light and Head Light Upgrades





Imstalling a Electronic Throttle



Click on any of the above for full details


A non car photo :)




Main Page

Phase 1

Phase 2



Fuel System

Cooling System

Matk VIII Fan Install

Exhaust Plans

K Member and Oil Pan

Test Fitting BBK Headers

Problem with Installing Headers

Steering to Clear Headers

Installing the Roll Bars

Fuel Cell Install

Ignition System

Brake Upgrade

Battery Relocation

Alignment on Lowered Car

Installing Coil Overs

Transmission Cooler Upgrade

Upgrade Lights