ZL1BOI - Jock White National Field Day 2014

Photos thanks to Stan ZL3TK and Ruth ZL4KA.


from L>R : Russell ZL2BER, Mike ZL1BWV, Barry ZL1AVW assembling the 40 ft 'ladder+scaffold pipe mast'



from L>R : Stan ZL3TK, Mike ZL2AUA preparing the operating tent


from L>R : Mike ZL2AUA, Ian ZL1CBD setting up the generator


from L>R : Bob ZL1RS, Mike ZL1BWV, Barry ZL1AVW tying off the 80m loop antenna


from L>R : Stan ZL3TK, Russell ZL2BER, Ian ZL1CBD, Graeme ZL1ANH surveying the trees for the 40m dipole halyard


from L>R : Bob ZL1RS, Barry ZL1AVW untangling the 80m loop halyard


from L>R : Bob ZL1RS, Ian ZL1CBD, Stan ZL3TK waist deep in some 'Northland Green'


from L>R : Mike ZL1BWV, Bob ZL1RS connecting the ground rod on the 80m vertical


"CQ TEST de ZL1BOI"


from L>R : Russell ZL2BER on 40m CW


from L>R : Stan ZL3TK on 80m SSB


from L->R : Barry ZL1AVW logging for Russell ZL2BER on 40m CW


from L>R : Mike ZL2AUA assembling the operating tent


from L>R : Graeme ZL1ANH, Stan ZL3TK (obscured) and Mike ZL2AUA at the operating tent


from L>R : Stan ZL3TK putting finishing touches to the operating tent frame
Background : erecting the 60 ft mast that doubled as 80m vertical and as a support for one corner of the 80m loop


from L>R : Bob ZL1RS, Mike ZL1BWV, Barry ZL1AVW, Russell ZL2BER at the 60 ft mast


from L>R : Russell ZL2BER and Mike ZL1BWV assembling the 40 ft 'ladder+scaffold pipe mast'


from L->R : adjusting the 60 ft mast guy ropes


Bob ZL1RS taping up the 80m full wave loop's Balun connections


Bob ZL1RS fixing the strain loop in the 80m full wave loop's 1/4WL matching section


from L>R : Barry ZL1AVW and Bob ZL1RS checking one of the 80m loop halyards


Mike ZL1BWV trying off the 80m full wave loop's halyard


from L>R : Mike ZL1BWV and Bob ZL1RS at the 40 ft 'ladder+scaffold pipe mast' base


Stan ZL3TK sorting the night light wiring in the operating tent


Mike ZL2AUA testing the generator supply voltage


Mike ZL2AUA testing the generator supply voltage


Stan ZL3TK sampling more of the 'Northland Green'


from L>R : Mike ZL2AUA, Bob ZL1RS and Graeme setting up the 80m transceiver and battery


Some of the "masts by nature" supplied at the QTH of Don ZL1HH and Jill ZL1DAJ


Graeme ZL1ANH


Mike ZL2AUA


from L>R : Barry ZL1AVW and Russell ZL2BER operating 40m


Stan ZL3TK logging an 80m QSO


Return to Club Events