08JUL98 - Work Begins on BLT-13


It's July 8, 1998. The modules for BLT-13 have been assembled. Payload Master Mike WA5TWT has arranged them on the kitchen table and is beginning the process of wiring the individual units together.
Tonight's test will involve the packet-radio system and the GPS receiver.
John WA5WOD offers suggestions concerning the connections between boxes.
Mike diverges to a description of the "steering" fin that will be used to stabalize the main payload during flight for best video.
The KPC-3 TNC has been successfully connected to the GPS receiver and the 70-cm transceiver. It's time to let it cook for a while.


<-Back