In the year 1991 ...
Tobbe/SM5FRH and Bosse/SM5FND, with hammer, preparing the concrete form for the mast foundation.
Time to fill it up with concrete.
Tage/SM5ERW pouring one more batch.
Tage disconnecting the crane after that the 40 meter tall tower was
lifted in place. It was an impressive performance of the crane operator.
And building the shack in the autumn 1992
Janne/SM5AKU
Bosse/SM5FND (left) and Sven-Bertil (SK)
Tobbe/SM5FRH
The finished schack