Trench 2002

This project buries all cables to my EME 9.2 meter dish, my HF tower, and my satellite arrays.

This array of photos shows what my cable mess looked like before, and the trench in progress.

It also shows my screw-ups, (fixed). I broke the septic pump wires, and one of the septic pipes too.

I am installing three 4" pvc and three 2" ducts and a bunch of direct burial stuff including the following cables:

QTY

Description

2

1 5/8 Heliax

6

7/8 Heliax

3

Direct bury power cable

4

Direct bury 25 pr control

2

RG-218

1

EW-52 Eliptical waveguide

I put one whole 4" duct in as a spare.

The 2" duct will contain lots of things not listed above.

73, KL6M

Home|Previous Page|Next Page

before.jpg
before.jpg

60.64 Kb
MVC001F.JPG
MVC001F.JPG

107.54 Kb
MVC003F.JPG
MVC003F.JPG

74.42 Kb
kubota.jpg
kubota.jpg

122.32 Kb
miditch.jpg
miditch.jpg

101.33 Kb
nocable.jpg
nocable.jpg

85.77 Kb
MVC008F.JPG
MVC008F.JPG

110.48 Kb
MVC009F.JPG
MVC009F.JPG

90.01 Kb
MVC010F.JPG
MVC010F.JPG

87.29 Kb
MVC005F.JPG
MVC005F.JPG

110.82 Kb
MVC006F.JPG
MVC006F.JPG

100.97 Kb
MVC007F.JPG
MVC007F.JPG

96.93 Kb

Page 1 of 1