![](IMG_0375-s.jpg) |
![](IMG_0443-s.jpg) |
Nigel was
interviews by local newspaper |
Justin on the band |
![](IMG_0444-s.jpg) |
![](IMG_0446-s.jpg) |
Kaz on 6m |
Station setup |
![](IMG_0450-s.jpg) |
![](IMG_0451-s.jpg) |
Robert on SSB
position | Jim
working CW |
![](IMG_0452-s.jpg) |
![](IMG_0454-s.jpg) |
Mike |
Nigel working SSB pileup |
![](IMG_0481-s.jpg) |
![](IMG_0482-s.jpg) |
Don interviewed by
local media |
Outlook of the shack |
![](IMG_0488-s.jpg) |
![](IMG_0489-s.jpg) |
Robert 3B9FR and
his son | Don
scheduling the shift |
![](IMG_0493-s.jpg) |
![](IMG_0494-s.jpg) |
test |
Mike on therest |
![](IMG_0512-s.jpg) |
![](IMG_0543-s.jpg) |
Justin in nap |
Don working 80CW |
![](IMG_0544-s.jpg) |
![](IMG_0545-s.jpg) |
Falk |
Jun and Bob |
![](IMG_0547-s.jpg) |
![](IMG_0549-s.jpg) |
Screenshot of the
logging software |
|
![](IMG_0548-s.jpg) |
![](IMG_0571-s.jpg) |
Overview of the operating position |
|
![](IMG_0572-s.jpg) |
![](IMG_0639-s.jpg) |
Typical op schedule |
|
![](IMG_0640-s.jpg) |
![](IMG_0644-s.jpg) |
John |
Erik |
![](IMG_0645-s.jpg) |
![](IMG_0646-s.jpg) |
Jim on SSb |
SSB site |
![](IMG_0660-s.jpg) |
![](IMG_0661-s.jpg) |
Tony at workshop |
Don assisting Helary |
![](IMG_0668-s.jpg) |
![](IMG_0724-s.jpg) |
Master computer
room |
Erik on 160 at ESP mode :-) |
![](IMG_0749-s.jpg) |
![](IMG_0848-s.jpg) |
Server screen |
Jens |
![](IMG_0849-s.jpg) |
![](IMG_0867-s.jpg) |
Danny |
Kaz and Jun |
![](IMG_0920-s.jpg) |
![](IMG_0922-s.jpg) |
EME op position |
Tony on the band |
![](IMG_0923-s.jpg) |
![](IMG_0924-s.jpg) |
Meg and Dave |
|