Bolting the stem base plate & other work bolt

foot pads

As well as welding the base plate we decided to bolt it down also, the magnetic drill took it in its stride to drill trough 15mm steel with a 12mm drill once it was kept cool. 6 bolts were used

2 Nuts were welded onto the stabilizing members to allow the adjustable feet to be fixed with bolts


jockey wheel

mudguards

Next a jockey wheel was bolted to the front of the trailer

Some lugs that were damaged during galvanizing were re-made/galvanized & welded before fixing the mudguards in place


trial run

winch

We erected the first section of mast to see how it looked & also to locate possible positions for pulley's & winches

Winch support will have to be galvanized

More soon

20/10/02