SI-List,
What, exactly would be the QC steps that you would like to see component vendors
ensure that their models pass, prior to release?
What I've gleaned so far:
- Validate to IBISCHK3 and document exceptions to warnings.
- Validate all curves with a visual graphing for discontinuity, or other
visually obvious errors.
- Validate that the VI curves pass through origin.
- Verify that a full pin map exists and is accurate against datasheet.
- Verify that all models exist.
- Validate accuracy of package parastics.
- Validate accuracy of dV/dt. Use 50 ohm load or datasheet load?
- Include and validate accuracy of C_comp, including min and max.
- Include 4 VT curves minimum. Use 50 ohm load or datasheet load?
- Include accurate Min, Typ, Max data, derived from a setup that has full
variation across PVT.
What else? Thanks.