We have 3 cars, 2
Pick up truck and shuttle bus. We arrived Songkhla area around 13:00 local
time and met Din (HS9EQY) with food's truck from Trung, Yong (HS4BPQ)
accommodation equipment truck and Peun (HS9CRB) VHF equipment and 3 big
gun HS9CA, HS9DP and HS9FA at seaport site. |
|
We are arrange boat to Island
immediately because we had promise with OM will start operate around 12-13
UTC. All equipment to our big boat |
|
Hurry up! Hurry
up! Leave to Nu Island immediately by speed boat. |
|
| Accommodation
team putting first tenk at small rock cavity before helping setup team put
antenna. On the right photo is our power plant BRIGG station 1 KW and
small YAMAHA 500 VA. |
|
|
|
|
The First antenna that we put it up
is HS680 vertical 6 Band and then R7000 vertical as well. We get on
the air at 1307 UTC. |
|
We separated 2 team one is operator
and put more antenna. The third antenna is 3E mono band for 10 meter at 10
meter height. |
|
|
|
CY and Son are the first 2
Operator starting time 13on 10 meter Band and 15 meter Band CW mode.
Until 1654 UTC. Son received signal from G3KMA on 10 meter Band on CW made
"UR IOTA is AS 145 AS 145 BK" |
|
|
|
|