The Great '02 Tower Project

Page 4


   The fun begins! Here we assemble and install the equalizer plates (one for each of the three anchors), add thirty feet of tower to the existing twenty, and raise all fifty feet into the air at once! That was scary. Then, a few days later, with help from Gil and Cheryl, we replace the temporary guy ropes with permanent guy wires. The names of the pictures indicate when the work was done. Pictures were taken by Gale Flagg.


(Click any picture to enlarge)
/n1chf/images/tower/09-12-1.jpg
Assembling equalizer
plates
/n1chf/images/tower/09-12-2.jpg
Equalizer plate
installed on anchor
/n1chf/images/tower/09-12-3.jpg
Help arrives

/n1chf/images/tower/09-12-4.jpg
Preparing section
three for installation
/n1chf/images/tower/09-12-5.jpg
Stan bolts on
section three
/n1chf/images/tower/09-12-6.jpg
Preparing to install
section four
/n1chf/images/tower/09-12-7.jpg
Bolting on
section four
/n1chf/images/tower/09-12-8.jpg
Raising the first
fifty feet
/n1chf/images/tower/09-12-9.jpg
What a relief!

/n1chf/images/tower/09-12-10.jpg
Steve just couldn't
wait to climb
/n1chf/images/tower/09-14-1.jpg
Lots of shiny new
stuff
/n1chf/images/tower/09-14-2.jpg
Cheryl prepares
turnbuckles
/n1chf/images/tower/09-14-3.jpg
Steve looks puzzled

/n1chf/images/tower/09-14-4.jpg
Gil pretends he's
fishing
/n1chf/images/tower/09-14-5.jpg
Steve climbs again

/n1chf/images/tower/09-14-6.jpg
Gil feeds guy wires
up the tower
/n1chf/images/tower/09-14-7.jpg
Steve prepares to
connect guys at 30'