-
Heater and High Voltage both
"soft" start
-
High Voltage delay timer: HV
cannot turn on before the tube is ready
Cannot apply drive without HV: PA kept in STDBY (No operation is possible
without HV)
HV plate line is fuse protected
-
The HV transformer protected by magnet
circuit breaker (overcurrent breaker)
-
Control and screen grids are
overcurrent protected (trip circuit)
-
Blower delay timer: Blowers run
after PA is off for better cooldown
-
Built-in coax relay sequencer: Separate
exciter & tower relay/preamp box outputs
-
Coax transfer relays (depends on the
order - contact to discuss)
-
Available also as RF Deck only;
complete except for HV supply: Requires 3KV @ 2.2A