Rotor/Stack Control

The above panel is used to transfer rotor and stack control to the 3 operating positions. The top row are connections for the various rotors, the bottom row for the Array Solutions and Comtek phasing equipment relay boxes. Each cable is labeled for the station#/rotor or station#/stack. For example, if station#1 wanted to use 20 meters, the operator would take the "station1/rotor" cable and plug it into the 20m rotor connector (upper left) and also plug the "station1/stack" cable into the 20m stack connector (below the 20m rotor connector). Easy!!