CHANGES TO COMMUNICATIONS PLAN

January 2001

Removed a number of blank lines, which got the whole plan down to 6 pages.

III D. 1.

Moved KB0ODC repeater from backup to primary

Added column for PL tone

III D. 3.

Removed location of ANG at Arrowhead and inserted the following line: They are used in a remote location along the race route.

IV A.

Added General Guidelines. Re lettered from A to D

Added 1. Acceptable

Added 2. Unacceptable

IV C. 3

Added the following line at the end. "Also see FCC Regulations 97.113b.

IV D.

Added subsections 3 & 4 to part 97.113a.

Added 97.113.b after 97.113a.

Added part 97.115b.

V B. 2

Added sub lines under heading of Checkpoints and Road Crossing to Net Control

V B. 3

Added last 2 lines. "As the race progresses Net Control may allow direct checkpoint-to-checkpoint calls without Net Control approval. It will be at Net Control's discretion when to start and end this procedure."