Inbetriebnahme

Unfortunately first some months after the first attempts in the house could be installed the parabolic-antennas at the intended locations. The antennas first became only roughly after view (to the luck lay she/it over 14 km...) organized. On Tübinger side became at the AGC-Ausgang of the Reveivers one volt-meter (= S-Meter) connected. As the Reutlinger station was switched to duration-business, that immediately jumped volt-meter in Tübingen upward. The S value could still be improved by more exact organizing of both antennas. The reception-level should amount to at least S9 (standardization is missing) and clearly lies over the empfangenen levels of TV-satellites. Subsequent Connectversuche and data exchange failed unfortunately, because at a modem of the PTT-FET (BS 107) through inattentiveness " was shot down ". As stopgap, the station was switched to duration-business then. To our surprise, data exchange was possible then, although the station, only through the OMT entkoppelt, that LNC with quite beautifully levels beaufschlagt should have. The Linklaufzeit was however bad, we were amazed however that it worked at all. After repair of the modem, the indicated Linklaufzeitens usually lie in the a - stelligen area, according to traffic. Sometimes even 2/2 are shown, although the Link works only in the Halbduplexbetrieb.