<-- back to flight 5, Mission 2A2 -->
next to flight 7, Mission 4A -->
Flight 6 - 3A
Launch Date:
5. Oct. 2000
Launch Vehicle:
US Space Shuttle: STS-92
Elements:
Integrated Truss Structure (ITS) Z1, PMA-3, Ku-band commnuciations systmem, Control Moment Gyros (CMGs)
ITS Z1 is an early exterior framework to allow first U.S. solar arrays on flight 4A to be temporarily installed on Unity for early power.
Ku-band communication system supports early science capability and U.S. television on 6A.
CMGs provide non-propulsive (electrically powered) attitude control when activated on 5A.
PMA-3 provides shuttle docking port for solar array installation on 4A, Lab installation on 5A.