<-- back to 25, Mission 13A   next to flight 27, Mission 1JA -->

10A

Flight 26 - 10A

Launch Date:
?
Launch Vehicle:
US Space Shuttle
Elements:
Node 2
  • The second of three station connecting modules, Node 2, attaches to end of U.S. Lab and provides attach locations for the Japanese laboratory, European laboratory, the Centrifuge Accomodation Module and later Multi-Purpose Logistics Modules
  • Primary docking location for the Shuttle will be a pressurized mating adapter attached to Node 2.