
Next step: Put in some steel and the base section:

Then you have to fill the hole. This is a pump that will to the job:

Then you need some concrete:

If the hole is filled it looks like this. Here you see 5 cubicmetres that wieght about 8 to 9 tons:

At last the new mast with a single 14el Yagi for 144 MHz:

A view over my homevillage (Gemmingen) from a nearby hill:
