Improvements to the KL6M EME System

The Tower, painted, cables buried, and new junction box

 

The shack:  One of three console sections, new power distribution, new open frame rack for linear amps.  A work in progress.

 

New drive motor in new sheet metal enclosure (Hall effect sensor and magnets on rear)

 

The tower end of the trench with cable access

 

The shack end of the cable trench, before final sealing of the concrete block wall:

 

The 20 ton actuator and new elevation drive motor